Findings · Solar power · Part 2, How the assets were obtained
One package of the 2019 solar tender drew no bids, and only Adani Green took the 4,000 MW moved from it
The Solar Energy Corporation of India's tender of June 2019 linked 8,000 MW of solar power to building solar factories. The Central Electricity Regulatory Commission's order records that 3, and that only Adani Green accepted the capacity moved from the package nobody bid for. The final award was 8000.
| Date | What the record shows | Document |
|---|---|---|
| 2019 | Ceiling tariff raised from Rs 2.75 to Rs 2.93/kWh to add manufacturing (objector's submission) 2.93 Rs/kWh ceiling | CERC Order 286/AT/2021, para 8(e); Commission's response para 64 |
| 2019-06-25 | SECI issues RfS: 8,000 MW ISTS solar linked to 2,000 MW manufacturing 8000 MW solar (Package A) + 2000 MW manufacturing | Order in Petition No. 286/AT/2021 (adoption of tariff), paras 2, 20 |
| 2019-11-22 | Bids received under manufacturing-linked tender 3 bids (all Package A); 0 under Package B | CERC Order 286/AT/2021, para 2 |
| 2019-12-10 | Only Adani Green accepts transferred Package B capacity 4000 MW at Rs 2.92/kWh | CERC Order 286/AT/2021, para 3 |
| 2020-06-08 | Final awarded capacity 8000 MW Adani Green (4000 MW Azure) at Rs 2.92/kWh | CERC Order 286/AT/2021, para 3 |
| 2021-07-15 | Voluntary tariff cut for Package I 2.54 Rs/kWh (3,000 MW Package I) | CERC Order 286/AT/2021, para 4 |
| 2021-11-03 | Voluntary tariff cut for Packages II-IV 2.42 Rs/kWh (7,000 MW: Adani 4,667 MW, Azure 2,333 MW) | CERC Order 286/AT/2021, paras 1(b), 4 |
| 2021-11-11 | APERC approves AP procurement of 7,000 MW from SECI 7000 MW | CERC Order 286/AT/2021 (recording SECI's submission), SECI submission (n) p.17 |
| 2021-12-01 | Tripartite PSA SECI-AP discoms-Government of AP signed 7000 MW (3000 MW 2024, 3000 MW 2025, 1000 MW 2026) Secondary source | Reported description of APERC order OP No. 3 of 2024 dated 12.04.2024, n/a |
| 2022-04-02 | CERC adopts tariffs (Rs 2.54 for 1,800 MW; Rs 2.42 for 7,000 MW) | CERC Order 286/AT/2021, paras 66-68, 81-84 |
| 2024-11-20 | US indictment unsealed (allegations, not findings) 5 counts Secondary source | U.S. v. Gautam S. Adani et al., 24-CR-433 (NGG), E.D.N.Y.; DOJ press release, n/a |
| 2026-05-14 | SEC moves for consent judgments; penalties without admission 6000000; 12000000 USD civil penalty (Gautam; Sagar) | SEC Litigation Release No. 26554, release text |
Andhra Pradesh agreed to buy 7,000 MW in 2021 after the tariff was cut to Rs 2.42 a unit. An objector told the Commission the ceiling tariff had been raised to accommodate the manufacturing condition; the Commission declined to examine the bidding structure and adopted the tariffs. This is the transaction behind the 2024 New York indictment, whose allegations are reported in Part 3 as allegations.
The documents
From CERC Order 286/AT/2021 of 2 April 2022, which records the bids, the transfer of capacity, the tariff revisions and the objections. The Andhra Pradesh cabinet decision is reported in the press and its order number was not found.
Every figure above is in the data tables with its source and page. Read the argument in full in Part 2 of the paper.