How the Adani and Reliance assets were obtained
Part 1 measured how large the two groups' positions are. Part 2 asks how they were obtained, whether by auction, by concession, by acquisition, or by a regulatory decision, and what auditors, regulators and courts recorded about each.
1. What a document can show
A government record can show who decided, when, by what process, what was bid or paid, what an official body objected to, and what a court held. It cannot show why a decision-maker chose as they did. Part 2 therefore reports processes and recorded findings, and makes no claim about motive. Three kinds of statement are kept apart throughout. They are decisions and holdings, which are facts about the record; findings by an auditor or regulator, which are that body's conclusions; and allegations, which are reported as allegations and never as findings.
Every event below is in the data tables with its document and page. Where a fact rests on a press report alone, the table says so and the text does not rely on it.
2. Airports and ports
2.1 Six airports in one round
In November 2018 the Union Cabinet approved leasing six Airports Authority airports (Ahmedabad, Jaipur, Lucknow, Guwahati, Thiruvananthapuram and Mangaluru) and set up an Empowered Group of Secretaries, chaired by the chief executive of NITI Aayog, to decide matters beyond the appraisal committee's remit. The Ministry of Civil Aviation records that this group decided on 17 November 2018 to put no limit on how many airports one bidder could win and to require no prior airport experience. Bidders needed Rs 3,500 crore of financial capacity and experience in any kind of infrastructure.
The Department of Economic Affairs and NITI Aayog both sent notes on the bid documents on 10 December 2018. The Kerala High Court's judgment summarises them. One asked for the bid parameter and the thresholds to be reviewed, the other said the two-stage procedure in the PPP guidelines had not been followed, that there was no approved model concession and no project cost estimate, and called the request for proposals "poorly prepared". The appraisal committee met the next day and the request for proposals went out on 14 December. The court held the notes to be recommendations that the committees could overrule and had considered. The Ministry's 2021 press note does not deny their content; it says they were not overruled because both departments sat on both committees.
Adani Enterprises quoted the highest fee per passenger at all six airports, by the Ministry's account. The only rival bid in a public record is at Thiruvananthapuram, where Adani bid Rs 168 per domestic passenger against Rs 135 from Kerala's state company, 20% lower and so outside the 10% band in which Kerala could have matched. The Cabinet approved three leases in July 2019 and three in August 2020, each for 50 years. By June 2024 the six concessionaires had paid the Airports Authority about Rs 2,032 crore in per-passenger fees and Rs 2,758 crore in upfront fees. The Kerala High Court dismissed the state's challenge in October 2020.
2.2 Mumbai and Navi Mumbai
Mumbai's airport came by acquisition. In August 2020 Adani Airport Holdings agreed to buy the debt of GVK's holding company, the route to GVK's 50.5% of Mumbai International Airport, and to complete the purchase of the 23.5% held by Airports Company South Africa and Bidvest. It took management control in July 2021 after approvals from the Union government, CIDCO and Maharashtra. Navi Mumbai's concession had been awarded in 2017, before Adani, to the GVK-led Mumbai company, which bid a 12.60% revenue share; the state auditor faulted signing it before the land was acquired. The CBI case against GVK and the Mumbai company, registered in June 2020, is reported in the press; no document in this record connects it to the sale.
2.3 Ports
The port record shows three routes. Some were negotiated purchases, such as 75% of Krishnapatnam at an enterprise value of Rs 13,572 crore in 2020, and Gopalpur in 2024. One was a sale by a state government, when Andhra Pradesh sold its 10.4% of Gangavaram to Adani Ports for Rs 644.78 crore in 2021, and no Government Order or valuation for that sale was found. Two came through insolvency, Dighi in 2020 and Karaikal in 2023, each on a resolution plan approved by the creditors and the tribunal.
Vizhinjam in Kerala was a concession, and the Comptroller and Auditor General audited it. Adani Ports was the lone bidder and asked for the full viability gap grant of Rs 1,635 crore; the state bears 67% of the cost. The auditor found that the 40-year term, ten years over the standard, gives the concessionaire Rs 29,217 crore of extra revenue, and that with the termination payment the state's net receipts over the concession come to minus Rs 5,608 crore. Kerala's replies are in the report, and the auditor did not accept them.
The Mundra record concerns environmental compliance. A committee set up by the environment ministry in 2012 reported in April 2013, and in January 2014 the Gujarat High Court ordered the ministry to decide the port's clearance and stopped further work until it did.
| Date | What the record shows | Document |
|---|---|---|
| 2013-04-18 | Mundra: Sunita Narain Committee report; MoEF show-cause (30.09.2013); MoEF order (18.09.2015) | Jusab Kasam Manjaliya v. Union of India, R/Special Civil Application No. 5509 of 2019, CAV judgment of 06.02.2023, paras 2-9, 28-29 |
| 2014-01-13 | Mundra: Gujarat HC directs Centre to decide MPSEZ environmental clearance within 30 days; halts further activity meanwhile | Gajubha (Gajendrasinh) Bhimaji Jadeja v. Union of India, Writ Petition (PIL) No. 21 of 2013, pp. 185-186 (operative part) |
| 2015-08-17 | Vizhinjam: Kerala awards concession to lone bidder APSEZ; concession agreement signed 1635 INR crore (VGF quoted = cap, 40% of TPC) | Report No. 4 of 2017, Public Sector Undertakings, Government of Kerala, Chapter III para 3.1, para 3.1.1 (pp. 87-88); Table 3.2 (p. 93) |
| 2017-05-23 | Vizhinjam: CAG audit findings on concession terms 29217 INR crore (extra revenue to concessionaire from 40- vs 30-year term) | Report No. 4 of 2017, Public Sector Undertakings, Government of Kerala, Chapter III, paras 3.1.7, 3.1.8.1, 3.1.9.1 (pp. 93-99) |
| 2017-10 | Navi Mumbai airport: CIDCO concession awarded to MIAL (lone surviving bid of two) 12.60 % of gross revenue (annual revenue share) | Report No. 4 of 2018, Public Sector Undertakings, Government of Maharashtra, Chapter III, paras 3.1.1, 3.1.10 (pp. 73-74) |
| 2018-11-08 | Cabinet in-principle approval to lease six AAI airports via PPPAC; EGoS constituted | Cabinet approves leasing out six airports - Ahmedabad, Jaipur, Lucknow, Guwahati, Thiruvananthapuram and Mangaluru through PPP, whole release (page dated 09 Nov 2018) |
| 2018-11-17 | EGoS decides bid terms: no cap on airports per bidder; no prior airport experience; single-stage bidding | 86 Registration Were Received In the Portal for 6 Airports Under the PPP Bidding Process (Press Note, Ministry of Civil Aviation), paras 3-4 |
| 2018-11-17 | EGoS directs single-stage bidding to finish transaction by 28.02.2019 (as argued from PPPAC record) | Mahesh G. v. Union of India and connected cases, W.P.(C) 2224/2019 & 7 others, judgment of 19.10.2020 (K. Vinod Chandran and C.S. Dias JJ.), para 13 |
| 2018-12-10 | DEA appraisal note and NITI Aayog office memorandum on the RFP, both dated 10.12.2018, forwarded to PPPAC | Mahesh G. v. Union of India and connected cases, W.P.(C) 2224/2019 & 7 others, judgment of 19.10.2020 (K. Vinod Chandran and C.S. Dias JJ.), paras 13, 51-54; list of exhibits in W.P.(C) 5482/2019 (P11, P13) |
| 2018-12-11 | PPPAC 85th meeting approves transaction (RFP) documents | Mahesh G. v. Union of India and connected cases, W.P.(C) 2224/2019 & 7 others, judgment of 19.10.2020 (K. Vinod Chandran and C.S. Dias JJ.), paras 13, 43, 53; Exhibit P12 in W.P.(C) 5482/2019 |
| 2018-12-14 | AAI issues RFP for six airports; bid parameter = per passenger fee; financial capacity threshold 3500 INR crore (minimum financial capacity) | Cabinet approves proposal for leasing out three airports - Jaipur, Guwahati and Thiruvananthapuram - of AAI through PPP, Background para |
| 2019-02-25 | Thiruvananthapuram: Adani bid vs Kerala nominee (KSIDC) bid 168 INR per domestic passenger (AEL); KSIDC 135 | Mahesh G. v. Union of India and connected cases, W.P.(C) 2224/2019 & 7 others, judgment of 19.10.2020 (K. Vinod Chandran and C.S. Dias JJ.), para 31 |
| 2019-02-26 | Bid participation: registrations, bidders, bids 32 bids (10 entities, 6 airports) | 86 Registration Were Received In the Portal for 6 Airports Under the PPP Bidding Process, para 2 |
| 2019-07-03 | Cabinet approves lease of Ahmedabad, Lucknow, Mangaluru to Adani Enterprises (50 years) 50 years (lease) | Cabinet approves proposal for leasing out of three airports viz. Ahmedabad, Lucknow and Mangaluru of AAI through PPP, whole release |
| 2019-07-04 | Lok Sabha told: Cabinet in-principle approval on 08.11.2018; EGoS composition; 180 days to complete formalities after concession 180 days (max. after concession agreement) | Lok Sabha Unstarred Question No. 2105, 'Privatisation of Airports', answer (a)-(e) |
| 2019-11-14 | CCI approves acquisition of 23.5% of MIAL (ACSA 10% + Bidvest 13.5%) by Adani Properties 23.5 % equity Secondary source | CCI approves acquisition of shareholdings in Mumbai International Airport Limited by Adani Properties Private Limited, report |
| 2020-01-03 | APSEZ agrees to acquire 75% of Krishnapatnam Port Company from CVR Group 13572 INR crore (enterprise value) | Acquisition of 75% stake of Krishnapatnam Port Company Limited (Reg. 30 intimation) and investor presentation 'Adani Ports signs Agreement to acquire Krishnapatnam Port', intimation p.1; presentation slide 4 (https://www.adaniports.com/-/media/Project/Ports/Investor/Investor-Downloads/Investors-Presentation/Acquisition-of-KPCL-by-APSEZ.pdf) |
| 2020-03-05 | Dighi Port: NCLT Mumbai approves APSEZ resolution plan 650 INR crore (upfront payment, as submitted by APSEZ) | Vishal Vijay Kalantri v. Shailen Shah (RP of Dighi Port Ltd), Company Appeal (AT)(Insolvency) No. 466 of 2020, paras 1, 3, 8; final para |
| 2020-06-27 | CBI FIR against GVK Group, MIAL and others (alleged Rs 705 crore loss to AAI) 705 INR crore (alleged) Secondary source | CBI case against GVK Group chairman, son over Mumbai airport scam, report |
| 2020-07-07 | ED registers money-laundering case based on CBI FIR; searches Secondary source | Enforcement Directorate files money laundering case against GVK Group, report |
| 2020-08-19 | Cabinet approves lease of Jaipur, Guwahati, Thiruvananthapuram to Adani Enterprises (50 years) 50 years (lease) | Cabinet approves proposal for leasing out three airports - Jaipur, Guwahati and Thiruvananthapuram - of AAI through PPP, whole release |
| 2020-08-31 | Adani Airport Holdings agrees to acquire GVK ADL debt (route to GVK's 50.5% of MIAL) 50.5 % of MIAL held via GVK ADL | Adani Airports to acquire controlling interest in Mumbai Airport (Reg. 30 disclosure), p.1 |
| 2020-10-19 | Kerala HC dismisses State of Kerala, KSIDC and union petitions against Thiruvananthapuram lease | Mahesh G. v. Union of India and connected cases, W.P.(C) 2224/2019 & 7 others, judgment of 19.10.2020 (K. Vinod Chandran and C.S. Dias JJ.), para 63 |
| 2021-01-19 | Concession agreements for Jaipur, Guwahati, Thiruvananthapuram signed; COD extensions for first three attributed to Covid | 86 Registration Were Received In the Portal for 6 Airports Under the PPP Bidding Process, paras 6-7 |
| 2021-01-21 | Government denies DEA/NITI objections were overruled; says both sat on EGoS and PPPAC | 86 Registration Were Received In the Portal for 6 Airports Under the PPP Bidding Process, paras 3-5 |
| 2021-01-21 | MoCA: sale of MIAL stakes governed by shareholders' agreement; independent of three-airport COD extension | 86 Registration Were Received In the Portal for 6 Airports Under the PPP Bidding Process, para 6 |
| 2021-02-06 | Completion of 23.5% MIAL stake purchase from ACSA Global and Bid Services Division (Mauritius) 1685.25 INR crore (reported) Secondary source | Adani Enterprises spurts after unit completes acquisition of 23.5% stake in MIAL, report |
| 2021-03-03 | Gangavaram: purchase of Warburg Pincus affiliate's 31.5% and DVS Raju family's 58.1% 1954 INR crore (31.5%); Rs 3,604 crore for 58.1% (share swap) Secondary source | Adani Ports gains on acquiring stake in Gangavaram Port, report |
| 2021-03-15 | Colombo WCT: Sri Lanka issues LoI to APSEZ consortium after Cabinet approval; 35-year BOT, APSEZ 51% 35 years (BOT) | Media Release: Adani Ports bolsters its global footprint with Colombo Port's West Container Terminal (Ref APSEZL/SECT/2020-21/191), pp. 1-2 |
| 2021-03-24 | Dighi Port: CCI closes information alleging abuse of dominance through the takeover | Vikas Verma v. Adani Ports and SEZ Ltd, Case No. 02 of 2021, order under s.26(2), paras 10, 16-18 |
| 2021-07-13 | AAHL takes management control of MIAL after approvals of GoI, CIDCO and Government of Maharashtra | Media Release: AAHL takes management control of Mumbai International Airport from the GVK Group, p.2 |
| 2021-09-22 | Gangavaram: APSEZ buys Government of Andhra Pradesh's 10.4% stake 644.78 INR crore | Acquisition of 10.4% stake of Gangavaram Port Limited (Ref APSEZL/SECT/2021-22/86), items 5-9 |
| 2022-10-17 | Supreme Court dismisses Kerala's SLP against HC judgment; land-ownership question left open Secondary source | SC dismisses Kerala's plea against leasing Thiruvananthapuram airport to Adani Enterprises, report |
| 2023-03-31 | Karaikal Port: NCLT Chennai approves APSEZ resolution plan; KPPL becomes wholly owned subsidiary 1485 INR crore (upfront payment to financial creditors) | Intimation under Reg. 30 - Investment in Karaikal Port Private Limited (Ref APSEZL/SECT/2023-24/1), p.1 |
| 2023-11-08 | Colombo WCT: US DFC commits USD 553 million loan to Colombo West International Terminal 553 USD million | DFC Commits Half Billion Dollars to Port Infrastructure in Colombo, Sri Lanka, whole release |
| 2024-03-25 | Gopalpur Port: APSEZ agrees to buy 95% from SP Group (56%) and Orissa Stevedores (39%) 1349 INR crore (equity; EV Rs 3,080 crore) | Agreement for acquisition of 95% stake of Gopalpur Port Limited (Ref APSEZL/SECT/2023-24/137), items 5-8 |
| 2024-08-08 | Per-passenger fees and upfront fees received by AAI from the six airports 2032 INR crore (PPF to June 2024); upfront fee Rs 2,758 crore | Lok Sabha Unstarred Question No. 2940, 'Airports Sold/Leased out to Private Companies', answer (a)&(b) |
| 2026-02 | Mundra (Navinal): Supreme Court sets aside Gujarat HC direction to recover ~108 ha of gauchar land; State to decide afresh after hearing APSEZ 108 hectares Secondary source | Supreme Court quashes Gujarat HC order to recover 108-hectare grazing land given to Adani Ports, report |
3. Coal
The Adani group reaches coal by two routes. It operates mines that state and central utilities own, as mine developer and operator, and since 2020 it has bought mines outright in the Ministry of Coal's commercial auctions.
3.1 Hasdeo Arand
Parsa East and Kanta Basan in Chhattisgarh's Hasdeo Arand forest were allocated to the Rajasthan state generation company in 2007, with an Adani company as mine operator and majority partner in the mining joint venture. On 22 June 2011 the environment ministry's Forest Advisory Committee recommended rejecting the diversion of 1,898 hectares of forest for these blocks. The next day the Minister of State for Environment overruled the committee and granted first-stage clearance. In March 2014 the National Green Tribunal sent the clearance back to the committee and suspended work; that suspension is reported to have been stayed by the Supreme Court. The Supreme Court's 2014 order cancelling coal allocations nationally included these blocks, and the Ministry of Coal's later records treat the same state company as the prior allottee. The second phase received fresh permissions in 2022 and is under challenge in the Supreme Court and the Chhattisgarh High Court.
3.2 Commercial auctions
Adani companies won 8 mines in the Ministry of Coal's commercial auctions between 2020 and 2023. Where the ministry published the number of bidders, most of these auctions drew two. Gondulpara drew 4 qualified bidders and Bijahan six. Gondbahera Ujheni East went to an Adani company on a single bid at the second attempt, with the approval of the Empowered Committee of Secretaries; the ministry records that eleven mines in all were allotted that way across the auctions. In one auction two Adani companies both qualified for the same mine, which another bidder won.
| Date | What the record shows | Document |
|---|---|---|
| 2007-06-25 | Parsa East and Kanta Basan coal blocks allocated to RRVUNL | Office Memorandum No.13016/74/2006-CA-I[Vol.II]: Invocation of Bank Guarantee in respect of Parsa East & Kanta Basan coal blocks, para 1 |
| 2011-06-23 | Forest Advisory Committee rejects PEKB and Tara diversion; MoS Environment overrules 1898.328 hectares of forest land (PEKB) | Sudiep Shrivastava v. Union of India, NGT Appeal No. 73/2012, judgment 24.03.2014, paras 1-3 |
| 2012-03-28 | Stage-II forest clearance for PEKB and Chhattisgarh order under s.2 FC Act | Sudiep Shrivastava v. Union of India, NGT Appeal 73/2012, para 4 |
| 2014-03-24 | NGT remands PEKB forest clearance to FAC and suspends work | Sudiep Shrivastava v. Union of India, NGT Appeal 73/2012, operative directions 2-4 (pp. 47-48) |
| 2014-09-24 | Supreme Court order cancelling coal block allocations; PEKB listed among 40 producing blocks cancelled 42 coal blocks quashed (of 46 in Annexures 1-2) | Manohar Lal Sharma v. Principal Secretary & Ors, W.P.(Crl.) 120 of 2012, order dated 24.09.2014, paras 36-37, 39-40; Annexure 1 sl. 35-36 |
| 2014-09-24 | Additional levy on coal extracted from cancelled blocks 295 Rs per metric tonne | Manohar Lal Sharma v. Principal Secretary, order dated 24.09.2014, para 40 |
| 2014-09-25 | NGT dismisses challenge to PEKB environmental clearance as time-barred | Sudiep Shrivastava v. Union of India, NGT Appeal No. 33 of 2013, concluding para |
| 2016-05 | Bank guarantee deduction for delay in PEKB development (prior allottee) 16.48452 Rs crore | Office Memorandum: Invocation of Bank Guarantee, Parsa East & Kanta Basan, paras 2-3 |
| 2018-03 | Talabira II & III MDO awarded by NLC India to Adani subsidiary 12200 Rs crore projected revenue (company figure) Secondary source | Reported (Business Standard, Mining Weekly) citing AEL exchange filing, n/a |
| 2019-04-03 | PKCL ownership: AEL 74%, RRVUNL 26% 74 % AEL equity | CARE Ratings press release on Parsa Kente Collieries Ltd (hosted on adanienterprises.com), company profile para |
| 2020-11 | Adani entities that bid in tranche 1 but lost | List of TQBs and Result of e-auction, 11th tranche, S.No. 1,3,5,6,11,13,17 |
| 2020-11-02 | Commercial auction tranche 1: technically qualified bidders for Gondulpara 4 technically qualified bidders | List of Technically Qualified Bidders, 11th CMSP / 1st MMDR tranche, S.No. 7 |
| 2020-11-02 | Dhirauli (MP): technically qualified bidders 2 technically qualified bidders | List of Technically Qualified Bidders, 11th CMSP / 1st MMDR tranche, S.No. 4 |
| 2020-11-03 | Dhirauli (MP) won by Stratatech 12.5 % revenue share | Result of e-auction for coal mines under 11th tranche, S.No. 8 |
| 2020-11-07 | Gondulpara (Jharkhand) won by Adani Enterprises 20.75 % revenue share (closing bid, forward e-auction) | Result of e-auction for coal mines under 11th tranche, S.No. 18 |
| 2021-04-02 | Gare Palma Sector II allotted to MAHAGENCO; Adani selected MDO after reverse auction 23.6 MTPA peak capacity (553.177 MT mineable) | Disclosure: Signing of Coal Mining Agreement (Reg. 30 SEBI LODR), Annexure A |
| 2021-08-02 | Tranche 2 day 1: Gondkhari (Maharashtra) to Adani Power Maharashtra 9.50 % revenue share final offer (reserve 4%) | Day 1 of Commercial Coal Mine Auction - 2nd Tranche (PIB Release ID 1741634), results table row 1 |
| 2021-08-02 | Tranche 2 day 1: Jhigador (Chhattisgarh) to CG Natural Resources 6.00 % revenue share final offer (reserve 4%) | Day 1 of Commercial Coal Mine Auction - 2nd Tranche (PIB Release ID 1741634), results table row 3 |
| 2021-12-16 | Bijahan (Odisha): bidders 6 bidders listed | Bids received (13th CMSP / 3rd MMDR tranche), S.No. 2 |
| 2022-02-08 | Bijahan won by Mahanadi Mines and Minerals 14.00 % revenue share | Result of e-auction (13th CMSP tranche), S.No. 2 |
| 2022-03-25 | Phase II PEKB forest permissions (MoEFCC and State) | NGT order in OA 59/2024 and connected OAs (Hasdeo tree felling news items), paras 15, 17 |
| 2022-07-26 | Hasdeo: Chhattisgarh Assembly resolution urging Centre to cancel Hasdeo coal block allocations Secondary source | Reported by Scroll.in and Down To Earth, n/a |
| 2022-10-10 | Gondbahera Ujheni East (MP) allocated on single bid after second attempt, with ECoS approval 5.00 % revenue share (vesting/allocation date 10.10.2022) | Commercial Coal Mine Auctions Totally Transparent, Fair & Based on Methodology (Release ID 1975677), table row 2 and following para |
| 2022-11-05 | Adani subsidiaries holding coal MDO and mining SPVs (related-party disclosure) | Disclosure of Related Party Transactions, half year ended 30.09.2022, rows 28, 42, 48, 51, 55, 64, 70, 75, 107, 149, 153 |
| 2023-01-31 | North West of Madheri (Maharashtra): bidders 2 bidders listed | List of Bidders, 16th CMSP / 6th MMDR tranche, S.No. 21 |
| 2023-01-31 | Purunga (Chhattisgarh): bidders 2 bidders listed (layout suggests Power Mech Projects and CG Natural Resources) | List of Bidders, 16th CMSP / 6th MMDR tranche, S.No. 24 |
| 2023-02-27 | North West of Madheri won by MH Natural Resources 5.50 % revenue share | Result of e-auction for commercial coal mines, Day 1 (2nd attempt 15th / 16th CMSP tranche), S.No. 7 |
| 2023-02-27 | Purunga won by CG Natural Resources 5.50 % revenue share | Result of e-auction for commercial coal mines, Day 1, S.No. 10 |
| 2023-07 | Ministry list of mines successfully auctioned in rounds 1-6 includes 8 Adani-entity mines 8 mines | Annexure 2: Details of coal blocks successfully auctioned till 6 rounds of commercial auctions, Annexure 2 rows 3, 18, 21, 23, 33, 75, 82, 85 |
| 2025-05-28 | NGT closes suo motu Hasdeo tree-felling cases, deferring to Supreme Court and Chhattisgarh HC 15000 trees (felling alleged in news item) | NGT order, OA 59/2024, 128/2024, 133/2024, paras 14-26 |
4. The manufacturing-linked solar award
In June 2019 the Solar Energy Corporation of India tendered 8,000 MW of solar power linked to building 2,000 MW of solar manufacturing. The Central Electricity Regulatory Commission's order of 2 April 2022 records that 3. Capacity from the package nobody bid for was moved to the other, and only Adani Green accepted it. The final award was 8000.
No state signed to buy the power until 2021. After the developers cut their tariff to Rs 2.42 a unit, Andhra Pradesh agreed to buy 7,000 MW and its regulator approved the purchase on 11 November 2021. An objector told the Commission that the ceiling tariff had been raised from Rs 2.75 to Rs 2.93 to make room for the manufacturing condition; the Commission declined to examine how the bidding had been structured and adopted the tariffs.
This is the transaction behind the 2024 indictment in New York. What the indictment alleges is set out in Part 3, as allegation. The record above does not depend on it.
| Date | What the record shows | Document |
|---|---|---|
| 2019 | Ceiling tariff raised from Rs 2.75 to Rs 2.93/kWh to add manufacturing (objector's submission) 2.93 Rs/kWh ceiling | CERC Order 286/AT/2021, para 8(e); Commission's response para 64 |
| 2019-06-25 | SECI issues RfS: 8,000 MW ISTS solar linked to 2,000 MW manufacturing 8000 MW solar (Package A) + 2000 MW manufacturing | Order in Petition No. 286/AT/2021 (adoption of tariff), paras 2, 20 |
| 2019-11-22 | Bids received under manufacturing-linked tender 3 bids (all Package A); 0 under Package B | CERC Order 286/AT/2021, para 2 |
| 2019-12-10 | Only Adani Green accepts transferred Package B capacity 4000 MW at Rs 2.92/kWh | CERC Order 286/AT/2021, para 3 |
| 2020-06-08 | Final awarded capacity 8000 MW Adani Green (4000 MW Azure) at Rs 2.92/kWh | CERC Order 286/AT/2021, para 3 |
| 2021-07-15 | Voluntary tariff cut for Package I 2.54 Rs/kWh (3,000 MW Package I) | CERC Order 286/AT/2021, para 4 |
| 2021-11-03 | Voluntary tariff cut for Packages II-IV 2.42 Rs/kWh (7,000 MW: Adani 4,667 MW, Azure 2,333 MW) | CERC Order 286/AT/2021, paras 1(b), 4 |
| 2021-11-11 | APERC approves AP procurement of 7,000 MW from SECI 7000 MW | CERC Order 286/AT/2021 (recording SECI's submission), SECI submission (n) p.17 |
| 2021-12-01 | Tripartite PSA SECI-AP discoms-Government of AP signed 7000 MW (3000 MW 2024, 3000 MW 2025, 1000 MW 2026) Secondary source | Reported description of APERC order OP No. 3 of 2024 dated 12.04.2024, n/a |
| 2022-04-02 | CERC adopts tariffs (Rs 2.54 for 1,800 MW; Rs 2.42 for 7,000 MW) | CERC Order 286/AT/2021, paras 66-68, 81-84 |
| 2024-11-20 | US indictment unsealed (allegations, not findings) 5 counts Secondary source | U.S. v. Gautam S. Adani et al., 24-CR-433 (NGG), E.D.N.Y.; DOJ press release, n/a |
| 2026-05-14 | SEC moves for consent judgments; penalties without admission 6000000; 12000000 USD civil penalty (Gautam; Sagar) | SEC Litigation Release No. 26554, release text |
5. Godda
Adani Power's 1,600 MW plant at Godda in Jharkhand sells all its output to Bangladesh. The commerce ministry notified a power special economic zone of 222.668 hectares for it in September 2019, which carries the tax treatment of an export unit. In August 2024 the Ministry of Power amended its cross-border electricity guidelines so that a plant built only to export can be connected to India's grid if its foreign buyer stops scheduling power or defaults. Godda is the only such plant the paper found. The earlier steps (the SEZ board's rejection in 2018 and approval in 2019, the Jharkhand agreement) rest on press reports, and are shown as such.
| Date | What the record shows | Document |
|---|---|---|
| 2012 | Jharkhand 2012 Energy Policy: State first right of refusal up to 25% of IPP capacity at JSERC price 25 % of installed capacity | Energy Policy Jharkhand 2012 (copy hosted by India Water Portal), IPP section |
| 2016-02 | Jharkhand-Adani MoU: 25% share to come 'from other sources' (Godda) 25 % share Secondary source | Reported (IANS via Ummid.com; Businessworld), n/a |
| 2017-11-05 | PPA between BPDB and Adani Power (Jharkhand) for 1,496 MW net 1496 MW net, 25 years Secondary source | Reported by Prothom Alo; PPA text published by Netra News, n/a |
| 2018-02 | Board of Approval for SEZs rejects Adani Power (Jharkhand) power SEZ Secondary source | Reported by Business Standard / PTI, n/a |
| 2019-02-25 | Board of Approval approves sector-specific power SEZ at Godda 425 hectares sought (222.68 formal + 202.32 in-principle) Secondary source | Reported by PTI / Business Today, n/a |
| 2019-08-20 | Letter of approval for Godda sector-specific SEZ (power) | Notification S.O. 3327(E), Gazette of India Extraordinary Part II Sec 3(ii), No. 3042, recital 2 (English text) |
| 2019-09-16 | Godda SEZ notified under s.4(1) SEZ Act 222.668 hectares | Notification S.O. 3327(E) dated 16.09.2019 (published 17.09.2019), operative para and Table total |
| 2023-06-25 | Godda Unit 2 COD; entire output exported to Bangladesh 1496 MW net (2x800 MW gross) | Intimation of commissioning of thermal power plant at Godda (Reg. 30 LODR), para 1-2 |
| 2024-08-12 | MoP amends cross-border guidelines cl. 8.9: exclusive-export plants may connect to Indian grid | Explanatory Memorandum to draft CERC (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2024, paras 1(c), 14-15 (p.5) |
| 2025-09-29 | MoP order under s.164 Electricity Act for APL line from Godda to Kahalgaon-Maithon 400 kV (LILO) Secondary source | Reported (Indian Express via The Wire, Business Today), n/a |
| 2025-12-09 | CERC notifies Cross Border Trade (Second Amendment) Regulations, 2025 Secondary source | Reported (TeamLease RegTech; Powerline), n/a |
6. Dharavi
The Bombay High Court's judgment of 20 December 2024 sets out how the Dharavi redevelopment was awarded. In the first tender, opened in January 2019, Seclink bid Rs 7,200 crore and Adani Rs 4,529 crore. The state cancelled that tender in 2020, on the ground that railway land had not been part of the bid documents. The fresh tender of 2022 added the railway land and further concessions; 3. Adani was selected at Rs 5,069 crore. The court dismissed Seclink's challenge, and recorded Adani's argument that the two price bids measured different things. A further challenge is reported to be before the Supreme Court.
| Date | What the record shows | Document |
|---|---|---|
| 2019-01-30 | Earlier Dharavi tender (DRP/1/2018) financial bids 7200; 4529 Rs crore (Seclink; Adani) | Seclink Technologies Corporation v. State of Maharashtra, W.P. No. 4823 of 2022, judgment 20.12.2024, para 13 (p.~9) |
| 2020-10-29 | Committee of Secretaries decides to cancel earlier Dharavi tender; Cabinet affirms | Seclink v. State of Maharashtra, W.P. 4823/2022, paras 1-3 |
| 2022 | Fresh Dharavi tender: bidders 3 bidders (2 technically qualified) | Seclink v. State of Maharashtra, W.P. 4823/2022, para 109 (court finding); also submissions at paras 56, 65 |
| 2022-09-28 | GR approving fresh Dharavi tender with railway land and added concessions | Seclink v. State of Maharashtra, W.P. 4823/2022, para 4 |
| 2024-12-20 | Bombay HC dismisses Seclink challenge | Seclink v. State of Maharashtra, W.P. 4823/2022, paras 115-116 |
| 2025-03-07 | Supreme Court issues notice on Seclink SLP; declines status quo; payments via single account Secondary source | Reported by LiveLaw / Verdictum, n/a |
7. Transmission, where the bidding was close
Not every award was thin. The two transmission auctions examined in full were contested to the last rupee. For the first phase of the Khavda lines, 7, and Adani won at Rs 1,000.33 million a year against Power Grid's Rs 1,002.84 million. At Karur, Adani won at Rs 183.54 million against Sterlite's Rs 184.01 million. Adani's 2018 purchase of Mumbai's electricity business was from Reliance Infrastructure, Anil Ambani's company, and was approved by the Maharashtra regulator.
| Date | What the record shows | Document |
|---|---|---|
| 2017 | MERC Case 140 of 2017: assignment of distribution licence to subsidiary as step in sale | Executive Summary, Case No. 140 of 2017, paras 1-7 |
| 2017-12-21 | RInfra-Adani Transmission definitive agreement for Mumbai integrated power business 18800 Rs crore total consideration (company estimate) | RInfra media release enclosed with letter to BSE/NSE, 28.06.2018, media release para 3 |
| 2018-06-28 | MERC approves sale of RInfra Mumbai business to Adani Transmission | RInfra media release: MERC approves sale (letter to BSE/NSE), media release paras 1-2 |
| 2021-10-21 | Khavda 3 GW Phase-I TBCB: responses to RfP 7 RfP responses (6 qualified; 4 in e-reverse auction) | Order in Petition No. 101/AT/2022 (Khavda-Bhuj Transmission Ltd), paras 14-17 |
| 2021-12-09 | Karur/Tiruppur 1,000 MW TBCB: Adani L-1 183.54 Rs million per annum levelised charges | Order in Petition No. 103/AT/2022 (17.05.2022), paras 13, 19-21 |
| 2021-12-14 | Khavda 3 GW Phase-I: Adani L-1 1000.33 Rs million per annum levelised charges | CERC Order 101/AT/2022 (10.05.2022), para 17 |
| 2023-12-05 | TBCB projects FY2021-23 won by Adani (Ministry of Power annexure) 18.35; 100.03; 213.48; 118.90 Rs crore yearly tariff (Karur; Khavda Ph-I; WR-SR export scheme; Khavda Ph-II Part A) | Annexure: Transmission projects awarded under TBCB, FY2021-FY2023 (reply to RS Unstarred Q 317), Annexure-I rows 7, 8, 23 and Khavda Ph-II Part A |
8. Land at Mundra
A committee constituted by the environment ministry in 2012 reported in April 2013 that 75 hectares of mangrove had been lost at Bocha Island near the Mundra port, and recommended a restoration fund of Rs 200 crore or 1% of project cost. It also recorded that grazing land at Zarpara village had been taken back by the state for the SEZ in 2007. No audit by the Comptroller and Auditor General finding land allotted to Adani at concessional rates was found. One reported audit figure on forest land valuation could not be confirmed from the report itself and is not used.
| Date | What the record shows | Document |
|---|---|---|
| 2007-11-19 | Gauchar (grazing) land at Zarpara resumed for Mundra SEZ 1000 acres (report also prints '42 hectares', an internal inconsistency) | MoEF Committee report on Mundra, s.6.2.1, section 6.2.1 |
| 2012-09-14 | MoEF constitutes committee to inspect Adani Port and SEZ, Mundra | Report of the Committee for Inspection of M/s Adani Port & SEZ Ltd, Mundra (Sunita Narain committee), Introduction p.1 |
| 2013-04 | Committee finds mangrove loss at Bocha Island conservation area 75 hectares of mangrove lost | MoEF Committee report on Mundra, section on mangrove destruction (Fig. 7) |
| 2013-04 | Committee recommends Environment Restoration Fund 200 Rs crore or 1% of project cost incl. TPP, whichever higher | MoEF Committee report on Mundra, recommendations (p. ~90) |
| 2015 | CAG: wrong eco-class for Mundra/Dhrub forest land led to NPV short recovery 58.64 Rs crore short recovery (2,008.42 ha) | CAG Report No. 1 of 2015 (Economic Sector, Government of Gujarat), para 3.4.1 (Forests and Environment Dept), para 3.4.1 |
| 2022-12-22 | CoS selects Adani Properties as highest bidder; Cabinet approves 5069 Rs crore price bid | Seclink v. State of Maharashtra, W.P. 4823/2022, paras 5, ~24 |
| 2023-07-17 | GR appointing Adani Properties; Letter of Award 5069 Rs crore | Seclink v. State of Maharashtra, W.P. 4823/2022, paras 6-7 and p.21 |
| 2024-07-10 | Navinal gauchar: Gujarat to resume 108 ha; SC stays HC order 108 hectares Secondary source | Reported (Bar & Bench, Tribune), n/a |
9. The KG-D6 gas field
Reliance won the KG-D6 block in 2000. Three audits by the Comptroller and Auditor General followed. The 2011 audit found that the whole 7,645 square kilometre block had been treated as a discovery area, so none of it was given back as the contract required; that the development plan's cost estimate rose from US$ 2.4 billion to US$ 5.2 billion plus 3.6 billion; that 10 (8 to Aker Group) high-value contracts were awarded on single financial bids; and that the profit-sharing formula gave the contractor a reason to spend early. The 2014 audit found US$ 10,442 million spent and US$ 9,293 million recovered as cost by March 2013. The 2016 follow-up put excess cost recovery at US$ 1,547.85 million.
The auditor did not find that costs were inflated. It said it could not yet validate them. The separate dispute over gas that migrated from ONGC's blocks went to arbitration, where Reliance won in 2018; the Delhi High Court upheld that award in 2023 and a Division Bench set it aside in February 2025, after which the petroleum ministry demanded US$ 2.81 billion. The appeal is in the Supreme Court.
| Date | What the record shows | Document |
|---|---|---|
| 2000-04 | PSC for KG-DWN-98/3 signed; block awarded under NELP-I 7645 sq km contract area | CAG Report No. 11 of 2016, Chapter XIV, para 14.1.1, PDF p.1 (printed p.103), para 14.1.1 |
| 2009-10 to 2012-13 | CAG: marketing margin collected outside revenue base 261.33 US$ million | Report No. 24 of 2014, Executive Summary, Exec. Summary PDF p.7, Para 2.8.3.1 |
| 2011-09-08 | CAG performance audit of hydrocarbon PSCs tabled (Report No. 19 of 2011-12) | Report No. 19 of 2011-12: Performance Audit of Hydrocarbon Production Sharing Contracts, report page (tabling date) |
| 2011-09-08 | CAG finding: entire contract area allowed as Discovery Area, avoiding 25% relinquishment 7645 sq km retained | Report No. 19 of 2011-12, Executive Summary, Exec. Summary PDF pp.5-6, Para 4.2.1 |
| 2011-09-08 | CAG finding: D1-D3 development plan capex rose from IDP to AIDP 2.4 -> 5.2 (Phase I) + 3.6 (Phase II) US$ billion estimated capex | Report No. 19 of 2011-12, Executive Summary, Exec. Summary PDF p.6, Para 4.3.1 |
| 2011-09-08 | CAG finding: high-value contracts awarded on single financial bids 10 (8 to Aker Group) contracts | Report No. 19 of 2011-12, Executive Summary, Exec. Summary PDF pp.7-8, Paras 4.4, 4.6 |
| 2011-09-08 | CAG finding: Investment Multiple profit-sharing gives contractor incentive to raise or front-load capex 28 -> 85 per cent GoI share of profit petroleum at IM 2.5 (KG-DWN-98/3 bid) Secondary source | Report No. 19 of 2011-12, Executive Summary, Exec. Summary PDF pp.9-11, Paras 8.1-8.2 |
| 2011-11 (initiated) | Cost-recovery arbitration (D1/D3 production shortfall) 1.005 (initial disallowance, May 2012 reported); ~247 (GoI claim per RIL, reported); >30 (GoI claim per Reuters) US$ billion / US$ million Secondary source | reported by Business Standard, Business Today, Reuters (via Outlook Business); primary not found |
| 2012-03 | CAG: D1-D3 development spending above MC-approved cost; facilities under-utilised 5.76 vs 5.20 approved US$ billion | Report No. 24 of 2014, Executive Summary, Exec. Summary PDF p.4, Paras 2.6.3-2.6.5 |
| 2012-12 (report); 2013-06-27 (CCEA) | Rangarajan Committee gas price formula; CCEA approval ~8.4 US$/mmBtu (reported projected price from Apr 2014) Secondary source | reported by Moneylife, Business Standard; PRS summary of Standing Committee report; primary not found |
| 2013-03-31 | Block expenditure and cost recovery to March 2013 10441.98 spent; 9293.22 cost recovered US$ million | Report No. 24 of 2014, Executive Summary, Exec. Summary p.iii (PDF p.2), para 2.1 |
| 2014-11-01 | 2014 gas pricing guidelines: KG-D6 D1/D3 price uplift held in gas pool pending cost-recovery arbitration 4.2 US$/mmBtu (price retained; difference to new price credited to GAIL gas pool) | New Domestic Natural Gas Pricing Guidelines, 2014, paras 1-2, 5, 6-7 |
| 2014-11-28 | CAG compliance audit of KG-D6 for 2008-09 to 2011-12 tabled (Report No. 24 of 2014) | Report No. 24 of 2014: Compliance Audit on Hydrocarbon Production Sharing Contracts, report page (tabling date) |
| 2014-11-28 | CAG items recommended for disallowance or recovery (examples) 160.81; 118.99; ~200 (Euro); 17.36; 45; 15 US$ million unless stated | Report No. 24 of 2014, Executive Summary, Exec. Summary PDF pp.3-5, Paras 2.4.2, 2.5.1, 2.7.1.1, 2.7.1.2.1-3 |
| 2015-11 | Gas migration: D&M report on ONGC gas produced through D1-D3 49.32 / 34.71 migrated; of which 85.15 / 73.25 produced via D1-D3 per cent of GIIP (to 31 Mar 2015) | Report No. 11 of 2016, Chapter XIV, para 14.2.2, PDF pp.2-3 (printed pp.104-105), para 14.2.2 |
| 2016 | CAG follow-up audit 2012-14: excess cost recovery 1547.85 US$ million (Rs 9,307.22 crore) | Report No. 11 of 2016, Chapter XIV (MoPNG), para 14.1, PDF p.1 (printed p.103), para 14.1 |
| 2016-08 | Shah Committee report (unjust enrichment; GoI entitled to restitution) Secondary source | reported by Business Standard / Moneylife (IANS); primary not found |
| 2018-07-24 | GoI claim for migrated gas; arbitral award in favour of consortium ~1.55 US$ billion (GoI claim) Secondary source | RIL letter to BSE/NSE, "Update to disclosure dated February 15, 2025", para 1 (quoting 15 Feb 2025 disclosure) |
| 2023-05-09 | Delhi HC single judge dismisses GoI challenge to award | RIL letter to BSE/NSE, 4 Mar 2025, para 1 |
| 2025-02-14 | Delhi HC Division Bench reverses single judge and sets aside award | RIL letter to BSE/NSE, 4 Mar 2025, para 1 |
| 2025-03-03 | MoPNG demand on PSC contractors after Division Bench judgment 2.81 US$ billion | RIL letter to BSE/NSE, 4 Mar 2025, paras 2-3 |
| 2025-2026 | Supreme Court appeals by RIL, BP, Niko against Division Bench judgment Secondary source | reported by Deccan Chronicle, India Legal; primary not found |
10. Jio's licence
Jio began as Infotel, an internet licensee that won broadband spectrum in all 22 circles in the 2010 auction for Rs 12,848 crore. In 2013 it moved to a unified licence that allowed voice calls, paying a migration fee of Rs 1,658 crore, the price set in 2001. The Comptroller and Auditor General's Report No. 20 of 2015 found that this gave the company an "undue advantage" of Rs 3,367 crore, because the fee took no account of the time value of money, and rejected the telecom department's reply. TRAI later cut the charge an operator pays another to complete its customers' calls, from 14 paise a minute to 6 in 2017 and to zero from 2021; the lower the charge, the less an operator whose customers make more calls than they receive pays out. The Competition Commission closed a predatory-pricing complaint against Jio in 2017; that order could not be retrieved, and its outcome is shown as reported.
| Date | What the record shows | Document |
|---|---|---|
| 2010 | BWA auction: Infotel (ISP licensee) wins BWA spectrum in all 22 service areas 12847.77 Rs crore bid | Report No. 20 of 2015, Union Government, Communications and IT Sector, para 2.8.4, Table-2, printed p.50 |
| 2010-06-10 | CAG: Economic Times report of RIL takeover of Infotel during auction; DoT took no action on confidentiality breach 12257 Rs crore (all-India BWA price at time of report) | Report No. 20 of 2015, para 2.8 (printed pp.46-47) and footnote 42 |
| 2013-08 (fee paid); 2013-10-21 (UL granted) | Migration of ISP-BWA licensee to Unified Licence with voice at 2001 entry fee 1658 + 15 Rs crore (migration fee + UL entry fee) | Report No. 20 of 2015, para 2.8.3, printed pp.47-49 |
| 2015-05-08 | CAG finding on migration fee: undue advantage 3367.29 Rs crore | Report No. 20 of 2015 (tabled 8 May 2015), para 2.8 opening summary; para 2.8.3 printed p.49; Conclusion printed pp.50-51; Annexure-VII |
| 2017-06-09 | CCI Case No. 03 of 2017 (Bharti Airtel v RIL and RJIL): predatory pricing complaint closed 6.4 per cent RJIL market share cited (reported) Secondary source | Order under Section 26(2), Case No. 03 of 2017 (order not seen), order not read; date per Reuters/Business Standard 9 Jun 2017 |
| 2017-09-19 | TRAI cuts mobile termination charge and sets zero date 14 -> 6 paise/min from 1 Oct 2017; 0 from 1 Jan 2020 paise per minute | Telecommunication Interconnection Usage Charges (Thirteenth Amendment) Regulations, 2017, regulation 2 (Schedule I); Explanatory Memorandum on Bill and Keep |
| 2019-12-17 | TRAI defers zero termination charge by one year 6 paise to 31 Dec 2020; 0 from 1 Jan 2021 paise per minute | Telecommunication Interconnection Usage Charges (Fifteenth Amendment) Regulations, 2019, regulation 2 |
| 2021-09-15 | Cabinet telecom reform and relief package (AGR, spectrum dues moratorium) up to 4 years moratorium on AGR and past-auction spectrum dues (NPV protected) | Cabinet approves major Reforms in Telecom Sector (Release ID 1755086), sections "Structural Reforms" and "Addressing Liquidity requirements" |
| 2022-01-19 | RJIL prepays all deferred spectrum liabilities from pre-March 2021 auctions 30791 Rs crore (incl. accrued interest), 585.3 MHz Secondary source | RJIL media release "RJIL prepays Rs. 30,791 crore..." (filed with exchanges by RIL), paras 1-3 |
11. Reliance in retail and media
Reliance agreed in 2020 to buy Future Group's retail and logistics businesses for Rs 24,713 crore. Amazon, an investor in a Future company, objected; the Supreme Court held in August 2021 that the emergency arbitrator's order in Amazon's favour was enforceable, and the deal lapsed in April 2022 when Future's secured creditors voted against it. The Disney media merger was approved by the Competition Commission in August 2024 subject to modifications the parties offered.
| Date | What the record shows | Document |
|---|---|---|
| 2020-08-29 | RRVL agrees to acquire Future Group retail, wholesale, logistics and warehousing businesses 24713 Rs crore lump-sum consideration (plus Rs 1,200 crore equity and Rs 400 crore warrants in FEL) | RRVL Media Release, 29 Aug 2020, paras 1-2 |
| 2021-08-06 | Supreme Court: emergency arbitrator award enforceable; no appeal against s.17(2) enforcement order 1431 Rs crore (Amazon investment in FCPL, 26 Dec 2019) | Amazon.com NV Investment Holdings LLC v. Future Retail Limited & Ors., judgment, paras 2.1, 2.3-2.4, 41, 76 |
| 2022-04-23 | Composite scheme cannot be implemented after secured creditors vote it down Secondary source | Letter to BSE/NSE, "Composite Scheme of Arrangement with Future Group entities and Reliance Group entities", single page |
| 2024-02-28 | RIL board approves Rs 11,500 crore investment in Star India JV 11500 Rs crore for 16.34% of SIPL | RIL Regulation 30 disclosure, Investment in Star India Private Limited, paras a-d |
| 2024-08-27 | CCI approves combination subject to voluntary modifications Secondary source | Media release "Reliance and Disney announce completion of transaction..." (filed by Network18), media release p.2 |
| 2024-11-14 | JV completed: valuation and ownership 70352 Rs crore post-money valuation | Media release "Reliance and Disney announce completion of transaction...", media release p.1 |
12. Political finance
The Supreme Court struck down electoral bonds in February 2024 and ordered the State Bank of India to disclose purchases, which the Election Commission published in March 2024. Qwik Supply Chain Private Limited bought bonds worth Rs 410 crore between January 2022 and November 2023. News reports linked the company to Reliance through a director and its registered address; Reliance said it is not a subsidiary of any Reliance company. No official filing establishing or ruling out the link was found, so the paper records the purchases and treats the link as reported. No purchaser in the published list carries the name Adani or Reliance, which does not rule out companies trading under other names.
13. What the record adds up to
Read together, the documents show three patterns. First, several of the Adani group's largest positions came through processes with few bidders or a single one, among them two-bidder coal auctions and a single-bid allotment, a solar tender where one package drew no bids and only Adani took the transferred capacity, and a Dharavi re-tender with two qualified bidders after a higher first bid was cancelled. Second, at decisive points an official body's objection was overruled or not examined, as with the forest committee in 2011, and the bidding structure the regulator declined to review in 2022. Third, where bidding was open and contested, as in the transmission auctions, Adani won on price by fractions of a percent.
For Reliance, the record is older and more about terms than about allocation. It covers the terms of a gas contract the auditor could not validate, and a licence migration the auditor priced at a Rs 3,367 crore advantage.
None of this establishes that any decision was improper. The Bombay High Court upheld the Dharavi award and the electricity regulator adopted the solar tariffs. What the record does establish is that a few public decisions, taken by a small number of officials and committees, did much to shape who holds India's infrastructure, and that the documents behind several of them (the forest committee's reasons, the SEZ board's minutes, the Competition Commission's orders) are not easily available to the public that bears their consequences.