Findings · Coal power · Part 1, Concentration
Adani Power runs 24% of India's private coal power capacity, mostly bought in a market that stopped growing
Private coal and lignite capacity grew fast to 2017-18 and then stopped. It was 75,546 MW in 2017-18 and 74,892 MW in 2025-26. Over the same years Adani Power went from 10,440 MW to 18,110 MW.
Gross consolidated capacity at 31 March, over CEA's utility capacity. Derived.
Data and 26 sources
| Year | Of private coal capacity | Of all coal capacity |
|---|---|---|
| 2013-14 | 18.9% | 5.9% |
| 2014-15 | 15.8% | 5.6% |
| 2015-16 | 15.0% | 5.6% |
| 2016-17 | 14.3% | 5.4% |
| 2017-18 | 13.8% | 5.3% |
| 2018-19 | 13.6% | 5.2% |
| 2019-20 | 16.3% | 6.0% |
| 2020-21 | 16.3% | 5.9% |
| 2021-22 | 18.1% | 6.5% |
| 2022-23 | 18.3% | 6.4% |
| 2023-24 | 20.2% | 7.0% |
| 2024-25 | 23.4% | 7.9% |
| 2025-26 | 24.2% | 7.9% |
- Adani Power Limited Annual Report 2013-14, Adani Power Limited
- Adani Power Limited Annual Report 2014-15, Adani Power Limited
- Adani Power Limited Annual Report 2015-16, Adani Power Limited
- Adani Power Limited Annual Report 2016-17, Adani Power Limited
- Adani Power Limited Annual Report 2017-18, Adani Power Limited
- Adani Power Limited Annual Report 2018-19, Adani Power Limited
- Adani Power Limited Annual Report 2019-20, Adani Power Limited
- Adani Power Limited Annual Report 2020-21, Adani Power Limited
- Adani Power Limited Annual Report 2021-22, Adani Power Limited
- Adani Power Limited Annual Report 2022-23, Adani Power Limited
- Adani Power Limited Annual Report 2023-24, Adani Power Limited
- Adani Power Limited Annual Report 2024-25, Adani Power Limited
- Adani Power Limited Annual Report 2025-26, Adani Power Limited
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2014, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2015, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2016, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2017, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2018, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2019, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2020, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2021, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2022, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2023, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2024, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2025, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2026, Central Electricity Authority (CEA), Ministry of Power
Data and 26 sources
| Year | All private coal | Adani Power |
|---|---|---|
| 2013-14 | 45,520 | 8,580 |
| 2014-15 | 58,405 | 9,240 |
| 2015-16 | 69,462 | 10,440 |
| 2016-17 | 73,142 | 10,440 |
| 2017-18 | 75,546 | 10,440 |
| 2018-19 | 76,518 | 10,440 |
| 2019-20 | 76,003 | 12,410 |
| 2020-21 | 76,003 | 12,410 |
| 2021-22 | 75,028 | 13,610 |
| 2022-23 | 74,428 | 13,610 |
| 2023-24 | 75,342 | 15,210 |
| 2024-25 | 74,926 | 17,510 |
| 2025-26 | 74,892 | 18,110 |
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2014, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2015, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2016, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2017, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2018, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2019, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2020, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2021, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2022, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2023, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2024, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2025, Central Electricity Authority (CEA), Ministry of Power
- All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2026, Central Electricity Authority (CEA), Ministry of Power
- Adani Power Limited Annual Report 2013-14, Adani Power Limited
- Adani Power Limited Annual Report 2014-15, Adani Power Limited
- Adani Power Limited Annual Report 2015-16, Adani Power Limited
- Adani Power Limited Annual Report 2016-17, Adani Power Limited
- Adani Power Limited Annual Report 2017-18, Adani Power Limited
- Adani Power Limited Annual Report 2018-19, Adani Power Limited
- Adani Power Limited Annual Report 2019-20, Adani Power Limited
- Adani Power Limited Annual Report 2020-21, Adani Power Limited
- Adani Power Limited Annual Report 2021-22, Adani Power Limited
- Adani Power Limited Annual Report 2022-23, Adani Power Limited
- Adani Power Limited Annual Report 2023-24, Adani Power Limited
- Adani Power Limited Annual Report 2024-25, Adani Power Limited
- Adani Power Limited Annual Report 2025-26, Adani Power Limited
The share therefore traced a U. It was 18.9% in 2013-14, fell to 13.6% by 2018-19 while others built, and rose to 24.2% as Adani bought plants at Udupi in April 2015, Raipur and Raigarh in 2019-20, and Mahan in March 2022. Godda, 1,600 MW in Jharkhand, was built by the group and sells its power to Bangladesh.
Of all coal and lignite capacity, public and private, Adani Power's share is 7.9%.
How this was measured
Adani Power's capacity is its gross consolidated thermal capacity at 31 March from its annual reports, which counts subsidiaries in full. The denominators are the Central Electricity Authority's installed capacity reports for utilities at 31 March, which leave out captive plants. Adani Power's own share claims change basis between years (its 2024-25 figure leaves Godda out, its 2025-26 figure puts it in); this calculation includes Godda throughout from 2023-24. Whether the CEA counts Godda in Jharkhand's private capacity was not confirmed.
Every figure above is in the data tables with its source and page. Read the argument in full in Part 1 of the paper.