Adani and Ambani

Findings · Coal power · Part 1, Concentration

Adani Power runs 24% of India's private coal power capacity, mostly bought in a market that stopped growing

Private coal and lignite capacity grew fast to 2017-18 and then stopped. It was 75,546 MW in 2017-18 and 74,892 MW in 2025-26. Over the same years Adani Power went from 10,440 MW to 18,110 MW.

Adani Power's share of coal and lignite power capacity
Adani Power's share of coal and lignite power capacityLine chart. Adani Power's share of private coal capacity was 18.9% in 2013-14, fell to 13.6%, and reached 24.2% in 2025-26. Its share of all coal capacity reached 7.9%.0%5%10%15%20%25%2013-142015-162017-182019-202021-222023-242025-26Of private coal capacity24.2%Of all coal capacity7.9%

Gross consolidated capacity at 31 March, over CEA's utility capacity. Derived.

Data and 26 sources
YearOf private coal capacityOf all coal capacity
2013-1418.9%5.9%
2014-1515.8%5.6%
2015-1615.0%5.6%
2016-1714.3%5.4%
2017-1813.8%5.3%
2018-1913.6%5.2%
2019-2016.3%6.0%
2020-2116.3%5.9%
2021-2218.1%6.5%
2022-2318.3%6.4%
2023-2420.2%7.0%
2024-2523.4%7.9%
2025-2624.2%7.9%
  1. Adani Power Limited Annual Report 2013-14, Adani Power Limited
  2. Adani Power Limited Annual Report 2014-15, Adani Power Limited
  3. Adani Power Limited Annual Report 2015-16, Adani Power Limited
  4. Adani Power Limited Annual Report 2016-17, Adani Power Limited
  5. Adani Power Limited Annual Report 2017-18, Adani Power Limited
  6. Adani Power Limited Annual Report 2018-19, Adani Power Limited
  7. Adani Power Limited Annual Report 2019-20, Adani Power Limited
  8. Adani Power Limited Annual Report 2020-21, Adani Power Limited
  9. Adani Power Limited Annual Report 2021-22, Adani Power Limited
  10. Adani Power Limited Annual Report 2022-23, Adani Power Limited
  11. Adani Power Limited Annual Report 2023-24, Adani Power Limited
  12. Adani Power Limited Annual Report 2024-25, Adani Power Limited
  13. Adani Power Limited Annual Report 2025-26, Adani Power Limited
  14. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2014, Central Electricity Authority (CEA), Ministry of Power
  15. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2015, Central Electricity Authority (CEA), Ministry of Power
  16. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2016, Central Electricity Authority (CEA), Ministry of Power
  17. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2017, Central Electricity Authority (CEA), Ministry of Power
  18. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2018, Central Electricity Authority (CEA), Ministry of Power
  19. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2019, Central Electricity Authority (CEA), Ministry of Power
  20. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2020, Central Electricity Authority (CEA), Ministry of Power
  21. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2021, Central Electricity Authority (CEA), Ministry of Power
  22. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2022, Central Electricity Authority (CEA), Ministry of Power
  23. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2023, Central Electricity Authority (CEA), Ministry of Power
  24. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2024, Central Electricity Authority (CEA), Ministry of Power
  25. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2025, Central Electricity Authority (CEA), Ministry of Power
  26. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2026, Central Electricity Authority (CEA), Ministry of Power
Private coal power capacity and Adani Power's part of it, in megawatts
Private coal power capacity and Adani Power's part of it, in megawattsLine chart. Private coal and lignite capacity was 74,892 MW in 2025-26, about where it was in 2017-18, while Adani Power's grew to 18,110 MW.010,00020,00030,00040,00050,00060,00070,00080,0002013-142015-162017-182019-202021-222023-242025-26All private coal74,892Adani Power18,110
Data and 26 sources
YearAll private coalAdani Power
2013-1445,5208,580
2014-1558,4059,240
2015-1669,46210,440
2016-1773,14210,440
2017-1875,54610,440
2018-1976,51810,440
2019-2076,00312,410
2020-2176,00312,410
2021-2275,02813,610
2022-2374,42813,610
2023-2475,34215,210
2024-2574,92617,510
2025-2674,89218,110
  1. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2014, Central Electricity Authority (CEA), Ministry of Power
  2. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2015, Central Electricity Authority (CEA), Ministry of Power
  3. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2016, Central Electricity Authority (CEA), Ministry of Power
  4. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2017, Central Electricity Authority (CEA), Ministry of Power
  5. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2018, Central Electricity Authority (CEA), Ministry of Power
  6. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2019, Central Electricity Authority (CEA), Ministry of Power
  7. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2020, Central Electricity Authority (CEA), Ministry of Power
  8. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2021, Central Electricity Authority (CEA), Ministry of Power
  9. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2022, Central Electricity Authority (CEA), Ministry of Power
  10. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2023, Central Electricity Authority (CEA), Ministry of Power
  11. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2024, Central Electricity Authority (CEA), Ministry of Power
  12. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2025, Central Electricity Authority (CEA), Ministry of Power
  13. All India Installed Capacity (in MW) of Power Stations (Utilities) as on 31.03.2026, Central Electricity Authority (CEA), Ministry of Power
  14. Adani Power Limited Annual Report 2013-14, Adani Power Limited
  15. Adani Power Limited Annual Report 2014-15, Adani Power Limited
  16. Adani Power Limited Annual Report 2015-16, Adani Power Limited
  17. Adani Power Limited Annual Report 2016-17, Adani Power Limited
  18. Adani Power Limited Annual Report 2017-18, Adani Power Limited
  19. Adani Power Limited Annual Report 2018-19, Adani Power Limited
  20. Adani Power Limited Annual Report 2019-20, Adani Power Limited
  21. Adani Power Limited Annual Report 2020-21, Adani Power Limited
  22. Adani Power Limited Annual Report 2021-22, Adani Power Limited
  23. Adani Power Limited Annual Report 2022-23, Adani Power Limited
  24. Adani Power Limited Annual Report 2023-24, Adani Power Limited
  25. Adani Power Limited Annual Report 2024-25, Adani Power Limited
  26. Adani Power Limited Annual Report 2025-26, Adani Power Limited

The share therefore traced a U. It was 18.9% in 2013-14, fell to 13.6% by 2018-19 while others built, and rose to 24.2% as Adani bought plants at Udupi in April 2015, Raipur and Raigarh in 2019-20, and Mahan in March 2022. Godda, 1,600 MW in Jharkhand, was built by the group and sells its power to Bangladesh.

Of all coal and lignite capacity, public and private, Adani Power's share is 7.9%.

How this was measured

Adani Power's capacity is its gross consolidated thermal capacity at 31 March from its annual reports, which counts subsidiaries in full. The denominators are the Central Electricity Authority's installed capacity reports for utilities at 31 March, which leave out captive plants. Adani Power's own share claims change basis between years (its 2024-25 figure leaves Godda out, its 2025-26 figure puts it in); this calculation includes Godda throughout from 2023-24. Whether the CEA counts Godda in Jharkhand's private capacity was not confirmed.

Every figure above is in the data tables with its source and page. Read the argument in full in Part 1 of the paper.